skip to main | skip to sidebar

Nick Williams SRT 251 Blog

Thursday, June 5, 2008

Site 3: Deakin University


This image depicts a view into the new atrium space of the extension to Deakin Uni Waterfront Campus. Its creation provides lighting to all adjoining spaces.

Medium Shot depicting the bolted steel connections of the new atrium space


Exterior shot detailing the concrete floor extension

This image depicts the concrete staircase and also displays some services in the piping hanging below the ceiling
Posted by Nick Williams at 7:07 AM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2008 (22)
    • ▼  June (17)
      • Major Assignment Final Presentation
      • Site 3: Deakin University
      • Article 7: New Look and new role for old CUB site
      • Article 6: Bluescope Steel Life Cycle Analysis
      • Article 5: Bluescope On Track for a stronger secon...
      • Major Assignment Overall design
      • Major Assignment Research + Development
      • Major Assignment: Hero Architect Le Corbusier
      • Site 2: TAC Building and Article
      • Major Project Research
      • Site Visit 1:Toll warehouse
      • Article 3: Concrete Solution to Gas problem
      • Article 2: Buried Galvanised Steel
      • Article 1: Is there a requirement of good faith in...
      • Construction Detail Week 6- Two Storey Connections
      • Construction Detail Week 5
      • Construction Detail Week 4- Concrete- Steel Connec...
    • ►  March (5)

About Me

Nick Williams
View my complete profile